SH 159 Bridge Replacement 2507
Fayette County · est $4.1M
Fayette County · est $4.1M
10 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | ACME BRIDGE COMPANY, INC. | $4,282,480.36 | — |
| 2 | KNIFE RIVER CORPORATION - SOUTH | $4,331,880.28 | $49,399.92 |
| 3 | RELMCO, INC. | $4,565,294.71 | $282,814.35 |
| 4 | HUNTER INDUSTRIES, LTD. | $4,580,640.42 | $298,160.06 |
| 5 | E-Z BEL CONSTRUCTION, LLC | $4,604,907.77 | $322,427.41 |
| 6 | C. E. BARKER, LTD. | $4,895,500.99 | $613,020.63 |
| 7 | STX CIVIL | $5,063,886.08 | $781,405.72 |
| 8 | TEXAS MATERIALS GROUP, INC. | $5,284,594.00 | $1,002,113.64 |
| 9 | HODGES AND SON CONSTRUCTION COMPANY, INC. | $5,575,560.00 | $1,293,079.64 |
| 10 | URBAN INFRACONSTRUCTION LLC | $5,996,900.00 | $1,714,419.64 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 432-7048 RIPRAP (STONE PROTECTION)(36 IN) | 3,072 CY | $246 | $756k | 18% |
| 416-7006 DRILL SHAFT (36 IN) | 1,610 LF | $246 | $396k | 9% |
| 425-7002 PRESTR CONC GIRDER (TX34) | 1,473.5 LF | $247 | $364k | 8% |
| 500-7001 MOBILIZATION | 1 LS | $325,000 | $325k | 8% |
| 422-7001 REINF CONC SLAB | 10,175 SF | $27 | $275k | 6% |
| 341-7050 D-GR HMA TY-D SAC-B PG70-22 | 1,507.3 TON | $157 | $237k | 6% |
| 132-7005 EMBANK (FNL)(OC)(TY C) | 10,430 CY | $17.4 | $181k | 4% |
| 247-7193 FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS) | 1,385.3 CY | $121 | $168k | 4% |
| 403-7001 TEMPORARY SPL SHORING | 6,981 SF | $23.3 | $163k | 4% |
| 341-7006 D-GR HMA TY-B PG70-22 | 944.6 TON | $141 | $133k | 3% |