New Copeland Ped Hybrid Beacon
Smith County · est $555k
Smith County · est $555k
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | REYNOLDS & KAY, LTD. | $539,227.25 | — |
| 2 | GARRET SHIELDS INFRASTRUCTURE | $573,655.84 | $34,428.59 |
| 3 | TIGHT LINE CONSTRUCTION, LLC | $636,391.45 | $97,164.20 |
| 4 | GREY SKY CONSTRUCTION LLC | $653,357.00 | $114,129.75 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $52,000 | $52k | 10% |
| 680-7002 INSTALL HWY TRF SIG (ISOLATED) | 1 EA | $44,500 | $45k | 8% |
| 531-7001 CONC SIDEWALKS (4") | 336 SY | $120 | $40k | 7% |
| 680-7011 INSTALL HWY TRF SIG (UPGRADE) | 1 EA | $36,000 | $36k | 7% |
| 686-7035 INS TRF SIG PL AM(S)1 ARM(32')LUM | 2 EA | $18,000 | $36k | 7% |
| 531-7007 CURB RAMPS (TY 3) | 7 EA | $4,000 | $28k | 5% |
| 687-7001 PED POLE ASSEMBLY | 8 EA | $3,100 | $25k | 5% |
| 529-7009 CONC CURB & GUTTER (TY II) | 388 LF | $55 | $21k | 4% |
| 528-7005 COLORED TEXTURED CONC (8") | 86 SY | $228 | $20k | 4% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 MO | $3,000 | $18k | 3% |