FM 974 F: FM 2776 T: south - FY 27
Brazos County · est $4.3M
Brazos County · est $4.3M
8 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | BIG CREEK CONSTRUCTION, LTD. | $3,771,592.08 | — |
| 2 | KNIFE RIVER CORPORATION - SOUTH | $4,272,476.33 | $500,884.25 |
| 3 | LARRY YOUNG PAVING, INC. | $4,285,537.95 | $513,945.87 |
| 4 | BRAZOS PAVING, INC. | $4,384,483.00 | $612,890.92 |
| 5 | TEXAS MATERIALS GROUP, INC. | $5,400,124.36 | $1,628,532.28 |
| 6 | CLARK CONSTRUCTION OF TEXAS, INC. | $5,517,932.45 | $1,746,340.37 |
| 7 | STX CIVIL | $5,665,103.85 | $1,893,511.77 |
| 8 | A. L. HELMCAMP, INC. | $6,311,852.15 | $2,540,260.07 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 247-7090 FL BS (CMP IN PLC)(TY A GR 1-2) (10") | 52,999 SY | $23 | $1.22M | 32% |
| 500-7001 MOBILIZATION | 1 LS | $275,000 | $275k | 7% |
| 275-7001 CEMENT | 853 TON | $225 | $192k | 5% |
| 110-7001 EXCAV (ROADWAY) | 11,856.4 CY | $15 | $178k | 5% |
| 316-7007 ASPH (AC-20-5TR) | 41,335 GAL | $3.75 | $155k | 4% |
| 275-7004 CEMENT TRT (EXIST MATL)(10") | 60,066 SY | $2.5 | $150k | 4% |
| 316-7241 AGGR (TY-PB OR PL, GR-4)(SAC-A) | 853 CY | $160 | $136k | 4% |
| 251-7027 REWORK BS MTL (TY B)(8")(ORD COMP) | 42,405 SY | $3 | $127k | 3% |
| 100-7002 PREPARING ROW | 159 STA | $750 | $119k | 3% |
| 467-7308 SET (TY II) (18 IN) (RCP) (6: 1) (P) | 52 EA | $1,500 | $78k | 2% |