FM3016_from FM 228 to CR 1685
Houston County · est $4.1M
Houston County · est $4.1M
5 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | L. S. EQUIPMENT CO., INC. | $3,814,102.44 | — |
| 2 | PINTO CONSTRUCTION CO., INC. | $3,853,111.26 | $39,008.82 |
| 3 | BIG CREEK CONSTRUCTION, LTD. | $3,925,687.78 | $111,585.34 |
| 4 | A. L. HELMCAMP, INC. | $4,041,533.51 | $227,431.07 |
| 5 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | $4,166,237.01 | $352,134.57 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 247-7210 FL BS (RDWY DEL) (TY D GR 3) | 18,939 TON | $55 | $1.04M | 27% |
| 344-7020 SP MIXES SP-C SAC-A PG70-22 | 4,602 TON | $165 | $759k | 20% |
| 500-7001 MOBILIZATION | 1 LS | $300,000 | $300k | 8% |
| 530-7010 DRIVEWAYS (ACP) | 2,470 SY | $70 | $173k | 5% |
| 275-7001 CEMENT | 753 TON | $220 | $166k | 4% |
| 100-7002 PREPARING ROW | 134.45 STA | $1,200 | $161k | 4% |
| 275-7009 CEMENT TRT (EXIST MATL & NEW BASE)(12") | 41,829 SY | $3.5 | $146k | 4% |
| 316-7088 ASPH (AC-15P OR CRS-2P) | 75 TON | $1,050 | $79k | 2% |
| 506-7002 ROCK FILTER DAMS (INSTALL) (TY 2) | 2,216 LF | $31.75 | $70k | 2% |
| 132-7015 EMBANK (VEH)(OC)(TY B) | 3,038 CY | $19.5 | $59k | 2% |