US 287 From US 287 EB to US 287 WB
Ellis County · est $1.1M
Ellis County · est $1.1M
5 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | BIG CREEK CONSTRUCTION, LTD. | $1,120,428.93 | — |
| 2 | KNIFE RIVER CORPORATION - SOUTH | $1,229,090.72 | $108,661.79 |
| 3 | GREY SKY CONSTRUCTION LLC | $1,261,207.50 | $140,778.57 |
| 4 | ED BELL CONSTRUCTION COMPANY | $1,361,955.72 | $241,526.79 |
| 5 | TEXAS MATERIALS GROUP, INC. | $1,493,751.08 | $373,322.15 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7020 SP MIXES SP-C SAC-A PG70-22 | 1,815 TON | $145 | $263k | 23% |
| 514-7001 PERM CTB (SGL SLOPE) (TY 1) (42 ) | 1,110 LF | $140 | $155k | 14% |
| 105-7059 RMV (8"-14") TRT/UNTRT BASE & ASPH PAV | 6,111 SY | $25 | $153k | 14% |
| 344-7001 SP MIXES SP-B PG64-22 | 1,098 TON | $135 | $148k | 13% |
| 500-7001 MOBILIZATION | 1 LS | $110,000 | $110k | 10% |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $21,000 | $42k | 4% |
| 354-7051 PLANE ASPH CONC PAV(2") | 14,267 SY | $2.75 | $39k | 4% |
| 247-7056 FL BS (CMP IN PLC)(TY D GR 1-2) (6") | 1,237 SY | $30 | $37k | 3% |
| 545-7010 CRASH CUSH ATTEN (INSTL)(R)(N)(TL3) | 1 EA | $22,400 | $22k | 2% |
| 134-7008 BACKFILL (TY B) | 4,450 LF | $5 | $22k |
| 2% |