Hwy 5 SUP - Newport Drive to Hynds Park
Grayson County · est $1.2M
Grayson County · est $1.2M
10 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | XIT PAVING AND CONSTRUCTION INC. | $993,246.10 | — |
| 2 | GARRET SHIELDS INFRASTRUCTURE | $1,028,214.10 | $34,968.00 |
| 3 | SCOUT 5 CONSTRUCTION LLC | $1,029,926.62 | $36,680.52 |
| 4 | PACE CONSTRUCTION SERVICES LLC | $1,098,896.25 | $105,650.15 |
| 5 | HIGHWAY 19 CONSTRUCTION LLC | $1,132,589.00 | $139,342.90 |
| 6 | TEXAS STEEL INDUSTRIAL PLACING, LLC | $1,165,168.63 | $171,922.53 |
| 7 | GHB EQUIPMENT COMPANY, L.L.C. | $1,177,990.02 | $184,743.92 |
| 8 | RATLIFF HARDSCAPE, LTD. | $1,184,343.56 | $191,097.46 |
| 9 | TI-ZACK CONCRETE, LLC | $1,275,173.69 | $281,927.59 |
| 10 | TIGHT LINE CONSTRUCTION, LLC | $1,665,424.50 | $672,178.40 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 531-7002 CONC SIDEWALKS (5") | 2,451 SY | $75 | $184k | 19% |
| 465-7336 INLET (COMP)(TY SIDEWALK BRIDGE) | 9 EA | $12,300 | $111k | 11% |
| 401-7001 FLOWABLE BACKFILL | 343.9 CY | $250 | $86k | 9% |
| 529-7009 CONC CURB & GUTTER (TY II) | 2,183 LF | $34 | $74k | 7% |
| 530-7021 INTRSCT, DRVWAYS, & TURNOUT (CONC) | 511 SY | $143 | $73k | 7% |
| 132-7003 EMBANK (FNL)(OC)(TY B) | 1,568 CY | $35 | $55k | 6% |
| 100-7002 PREPARING ROW | 34 STA | $1,335 | $45k | 5% |
| 500-7001 MOBILIZATION | 1 LS | $39,000 | $39k | 4% |
| 105-7016 RMV (16"-20") TRT/UNTRT BASE & ASPH PAV | 505 SY | $52 | $26k | 3% |
| 530-7022 INTRSCT, DRVWAYS, & TURNOUT (ACP) | 205 SY | $113 | $23k | 2% |