US 90A Construct Roundabout 2508
Lavaca County · est $6.3M
Lavaca County · est $6.3M
2 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | HUNTER INDUSTRIES, LTD. | $6,702,218.10 | — |
| 2 | E-Z BEL CONSTRUCTION, LLC | $6,798,528.40 | $96,310.30 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Bid tab · TxDOT
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 360-7004 CONC PVMT (CRCP) (10") | 11,571 SY | $129 | $1.49M | 20% |
| 800-7002 NO. OF DAYS MILESTONE 1 | 13,995 $/D | $65 | $910k | 12% |
| 500-7001 MOBILIZATION | 1 LS | $751,124 | $751k | 10% |
| 527-7002 COLORED TEXTURED CONC (5") | 4,106 SY | $124.2 | $510k | 7% |
| 341-7050 D-GR HMA TY-D SAC-B PG70-22 | 4,428 TON | $114.6 | $507k | 7% |
| 508-7001 CONSTRUCTING DETOURS | 6,294 SY | $58.34 | $367k | 5% |
| 341-7001 D-GR HMA TY-B PG64-22 | 2,593 TON | $103.6 | $269k | 4% |
| 360-7007 CONC PVMT (CRCP) (13") | 1,192 SY | $200 | $238k | 3% |
| 247-7193 FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS) | 2,688 CY | $75.52 | $203k | 3% |
| 104-7001 REMOV CONC (PAV) | 10,483 SY | $18.7 | $196k | 3% |