TASA FM 1306, FM 51 to Gainesville HS
Cooke County · est $2.8M
Cooke County · est $2.8M
12 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | TEXAS STEEL INDUSTRIAL PLACING, LLC | $2,192,971.75 | — |
| 2 | STX CIVIL | $2,231,704.00 | $38,732.25 |
| 3 | XIT PAVING AND CONSTRUCTION INC. | $2,296,745.50 | $103,773.75 |
| 4 | TI-ZACK CONCRETE, LLC | $2,365,287.80 | $172,316.05 |
| 5 | ALTUS CONSTRUCTION LLC | $2,470,594.75 | $277,623.00 |
| 6 | PROFESSIONAL TRAFFIC CONTROL LLC | $2,518,586.87 | $325,615.12 |
| 7 | GARRET SHIELDS INFRASTRUCTURE | $2,677,525.15 | $484,553.40 |
| 8 | TUCAN CONTRACTING, LLC | $2,791,150.74 | $598,178.99 |
| 9 | JAGOE-PUBLIC COMPANY | $2,828,006.45 | $635,034.70 |
| 10 | ED BELL CONSTRUCTION COMPANY | $3,268,724.85 | $1,075,753.10 |
| 11 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | $3,496,935.05 | $1,303,963.30 |
| 12 | O. TREVINO CONSTRUCTION, LLC | $3,699,479.80 | $1,506,508.05 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 531-7001 CONC SIDEWALKS (4") | 4,834 SY | $70 | $338k | 15% |
| 529-7009 CONC CURB & GUTTER (TY II) | 6,661 LF | $40 | $266k | 12% |
| 423-7015 RETAINING WALL (SPREAD FOOTING) | 2,520 SF | $95 | $239k | 11% |
| 500-7001 MOBILIZATION | 1 LS | $219,277 | $219k | 10% |
| 471-7003 GRATE & FRAME | 66 EA | $1,600 | $106k | 5% |
| 531-7025 CONC SIDEWALKS (SPECIAL) | 416 SY | $215 | $89k | 4% |
| 432-7002 RIPRAP (CONC)(5 IN) | 150.5 CY | $550 | $83k | 4% |
| 450-7059 RAIL (HANDRAIL)(TY B) | 804 LF | $99.28 | $80k | 4% |
| 530-7006 DRIVEWAYS (CONC) | 784 SY | $100 | $78k | 4% |
| 132-7003 EMBANK (FNL)(OC)(TY B) | 1,707.6 CY | $45 | $77k | 4% |