VA: 0915-15-101; TPW
Kerr County · est $1.1M
Kerr County · est $1.1M
7 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | LONE STAR PAVING COMPANY | $908,186.10 | — |
| 2 | LCR TOTAL TRANSPORT LLC | $995,652.00 | $87,465.90 |
| 3 | CK NEWBERRY, LLC | $1,124,976.30 | $216,790.20 |
| 4 | DEAN WORD COMPANY, LTD. | $1,337,977.29 | $429,791.19 |
| 5 | CLARK CONSTRUCTION OF TEXAS, INC. | $1,356,922.02 | $448,735.92 |
| 6 | GREY SKY CONSTRUCTION LLC | $1,455,421.20 | $547,235.10 |
| 7 | C. E. BARKER, LTD. | $2,503,279.80 | $1,595,093.70 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 351-7005 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") | 7,092 SY | $50 | $355k | 39% |
| 341-7051 D-GR HMA TY-D PG70-22 (LEVEL-UP) | 1,000 TON | $120 | $120k | 13% |
| 316-7073 ASPH (AC-15P OR AC-10-2TR) | 22,184 GAL | $5 | $111k | 12% |
| 316-7211 AGGR (TY-PB, GR-4)(SAC-B) | 616 CY | $180 | $111k | 12% |
| 666-7423 REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 41,254 LF | $0.7 | $29k | 3% |
| 666-7347 PAVEMENT SLER 6" | 41,254 LF | $0.5 | $21k | 2% |
| 500-7001 MOBILIZATION | 1 LS | $20,000 | $20k | 2% |
| 134-7001 BACKFILL (TY A) | 242.48 STA | $80 | $19k | 2% |
| 530-7006 DRIVEWAYS (CONC) | 133 SY | $140 | $19k | 2% |
| 505-7003 TMA (MOBILE OPERATION) | 22 DAY | $600 | $13k | 1% |