Bridge Bmip US 83 SB @ BU 84 Uprr
Taylor County · est $6.0M
Taylor County · est $6.0M
14 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | THE TRUESDELL CORPORATION | $4,004,004.00 | — |
| 2 | GIBSON & ASSOCIATES, INC. | $4,165,431.80 | $161,427.80 |
| 3 | RAGLE CONSTRUCTION, INC. | $4,206,128.00 | $202,124.00 |
| 4 | BLACKSMITH VENTURES LLC | $4,239,303.00 | $235,299.00 |
| 5 | MPB, INC. | $4,389,566.50 | $385,562.50 |
| 6 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | $4,417,691.00 | $413,687.00 |
| 7 | GARRET SHIELDS INFRASTRUCTURE | $4,763,758.15 | $759,754.15 |
| 8 | STRUCTURAL INTEGRITY GROUP LLC | $4,889,399.00 | $885,395.00 |
| 9 | SCOTT TUCKER CONSTRUCTION COMPANY, LLC | $5,100,340.00 | $1,096,336.00 |
| 10 | PREMIER CONTRACTORS LLC | $5,257,325.00 | $1,253,321.00 |
| 11 | PATHFIELD INVESTMENTS LLC | $5,355,257.00 | $1,351,253.00 |
| 12 | MYERS & SONS CONSTRUCTION LLC | $5,492,019.04 | $1,488,015.04 |
| 13 | TI-ZACK CONCRETE, LLC | $5,608,891.25 | $1,604,887.25 |
| 14 | SOUTHERN ROAD & BRIDGE, LLC | $7,360,057.00 | $3,356,053.00 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 439-7019 POLYESTER POLYMER CONC OVERLAY (3") | 5,500 SY | $257 | $1.41M | 35% |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 4,100 SF | $150 | $615k | 15% |
| 439-7015 POLYESTER POLYMER CONC OVERLAY (3/4") | 6,200 SY | $88 | $546k | 14% |
| 500-7001 MOBILIZATION | 1 LS | $410,645 | $411k | 10% |
| 446-7020 CLEAN AND PAINT EXIST STR (REF NO. 1) | 1 EA | $320,000 | $320k | 8% |
| 428-7001 PENETRATING CONCRETE SURFACE TREATMENT | 5,790 SY | $16 | $93k | 2% |
| 495-7001 RAISING EXIST STRUCT | 1 LS | $89,000 | $89k | 2% |
| 438-7007 CLEANING AND SEALING EXIST JOINTS (CL7) | 1,010 LF | $65 | $66k | 2% |
| 505-7001 TMA (STATIONARY) | 146 DAY | $380 | $55k | 1% |
| 442-7010 STR STEEL (PEDESTAL) | 4,200 LB | $10.5 |
| $44k |
| 1% |