Replace SEJ Joints and Bridge Repairs
Harris County · est $343k
Harris County · est $343k
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | PREMIER CONTRACTORS LLC | $249,972.00 | — |
| 2 | STRUCTURAL INTEGRITY GROUP LLC | $305,107.00 | $55,135.00 |
| 3 | ISI CONTRACTING, INC. | $310,264.00 | $60,292.00 |
| 4 | ICOS MANAGEMENT, LLC | $336,888.63 | $86,916.63 |
| 5 | PATHFIELD INVESTMENTS LLC | $345,410.00 | $95,438.00 |
| 6 | MC2 CIVIL, LLC | $466,875.00 | $216,903.00 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 785-7011 BRIDGE JOINT REPLACEMENT (SEJ) | 273.5 LF | $400 | $109k | 44% |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 110 SF | $500 | $55k | 22% |
| 429-7003 CONC STR REPAIR(DECK REP(PART DEPTH)) | 156 SF | $300 | $47k | 19% |
| 500-7001 MOBILIZATION | 1 LS | $10,000 | $10k | 4% |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 164 LF | $60 | $10k | 4% |
| 780-7002 CNC CRACK REPAIR (DISCRETE)(INJECT) | 45 LF | $200 | $9k | 4% |
| 361-7010 FULL - DEPTH REPAIR CRCP (15") | 4 CY | $1,000 | $4k | 2% |
| 512-7090 PCTB (MOVE)(F-SHAPE OR SNGL SLP)TY1 | 360 LF | $8 | $3k | 1% |
| 778-7002 CONCRETE RAIL REPAIR (MISC) | 5 LF | $300 | $2k | 1% |
| 778-7004 CONCRETE RAIL REPLACEMENT (IN-KIND) | 5 LF |
| $300 |
| $2k |
| 1% |