US 75 from Wilson Creek to Exchange Pkwy
Collin County · est $3.1M
Collin County · est $3.1M
7 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | SICE, INC. | $2,840,382.40 | — |
| 2 | ELECNOR BELCO ELECTRIC, INC. | $3,012,157.25 | $171,774.85 |
| 3 | LIGHT IT UP ELECTRIC | $3,019,376.00 | $178,993.60 |
| 4 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC | $3,068,126.99 | $227,744.59 |
| 5 | AMERICAN LIGHTING AND SIGNALIZATION, LLC | $3,075,000.00 | $234,617.60 |
| 6 | MICA CORPORATION | $3,158,891.85 | $318,509.45 |
| 7 | Lumin8 Transportation Technologies, LLC | $3,231,255.50 | $390,873.10 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 619-7001 ITS MULTI-DUCT CND (PVC-40) | 18,035 LF | $38.2 | $689k | 24% |
| 619-7011 ITS MULTI-DUCT CND (HDPE)(BORE) | 14,450 LF | $29.25 | $423k | 15% |
| 500-7001 MOBILIZATION | 1 LS | $281,458 | $281k | 10% |
| 623-7006 ITS GND BOX(PCAST) TY 1 (243660)W/APRN | 50 EA | $4,739 | $237k | 8% |
| 6027-7013 FIBER OPTIC CBL (SNGL-MODE)(48 FIBER) | 42,370 LF | $2.83 | $120k | 4% |
| 6027-7002 FIBER OPTIC CBL (SINGLE-MODE)(36 FIBER) | 40,645 LF | $2.83 | $115k | 4% |
| 6027-7026 FIBER OPTIC PATCH PANEL (96 POSITION) | 6 EA | $17,393 | $104k | 4% |
| 6010-7001 ITS RVSD (DATA COLLECT & WWA) SYS | 8 EA | $12,559 | $100k | 4% |
| 619-7008 ITS MULTI-DUCT CND (RMC) | 775 LF | $95.8 | $74k | 3% |
| 618-7036 CONDT (PVC) (SCH 40) (3") |
| 2,730 LF |
| $25.79 |
| $70k |
| 2% |