FUA erosion Repair 26
Lamar County · est $824k
Lamar County · est $824k
12 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | THE TRUESDELL CORPORATION | $734,734.00 | — |
| 2 | JACKSON EXCAVATION, LLC | $778,173.00 | $43,439.00 |
| 3 | ROAD DOCTORS LLC | $781,028.00 | $46,294.00 |
| 4 | GARRET SHIELDS INFRASTRUCTURE | $884,940.00 | $150,206.00 |
| 5 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | $944,325.00 | $209,591.00 |
| 6 | THK CONSTRUCTION LLC | $960,659.05 | $225,925.05 |
| 7 | ICOS MANAGEMENT, LLC | $984,245.00 | $249,511.00 |
| 8 | PATHFIELD INVESTMENTS LLC | $1,041,500.00 | $306,766.00 |
| 9 | TUCAN CONTRACTING, LLC | $1,190,575.10 | $455,841.10 |
| 10 | SHALOM SERVICES CORPORATION | $1,198,550.00 | $463,816.00 |
| 11 | H. V. CAVER, INC. | $1,310,540.30 | $575,806.30 |
| 12 | PREMIER CONTRACTORS LLC | $1,576,067.00 | $841,333.00 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 432-7045 RIPRAP (STONE PROTECTION)(24 IN) | 3,649 CY | $110 | $401k | 55% |
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 948 CY | $120 | $114k | 15% |
| 459-7010 GABIONS (3' X 3')(GALV) | 115 CY | $300 | $35k | 5% |
| 401-7001 FLOWABLE BACKFILL | 43 CY | $750 | $32k | 4% |
| 500-7001 MOBILIZATION | 1 LS | $26,166 | $26k | 4% |
| 132-7015 EMBANK (VEH)(OC)(TY B) | 467 CY | $50 | $23k | 3% |
| 432-7041 RIPRAP (STONE PROTECTION)(12 IN) | 145 CY | $135 | $20k | 3% |
| 110-7002 EXCAV (CHANNEL) | 557 CY | $30 | $17k | 2% |
| 100-7002 PREPARING ROW | 8 STA | $2,000 | $16k | 2% |
| 735-7060 DRIFTWOOD REMOVAL | 177 CY | $65 | $12k | 2% |