SH 495 - Traffic Signal Impr.
Hidalgo County · est $4.6M
Hidalgo County · est $4.6M
3 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | $3,504,673.35 | — |
| 2 | THE LEVY COMPANY, LLC | $3,633,473.11 | $128,799.76 |
| 3 | TRAF-TEX, INC. | $4,278,678.87 | $774,005.52 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 6008-7002 RVDS (ADVANCE DETECTION ONLY) | 34 EA | $10,650 | $362k | 10% |
| 6008-7001 RVDS (PRESENCE DETECTION ONLY) | 40 EA | $8,500 | $340k | 10% |
| 6008-7003 RVDS (PRESENCE AND ADVANCE DETECTION) | 28 EA | $9,500 | $266k | 8% |
| 500-7001 MOBILIZATION | 1 LS | $205,000 | $205k | 6% |
| 680-7002 INSTALL HWY TRF SIG (ISOLATED) | 17 EA | $8,500 | $145k | 4% |
| 618-7065 CONDT (PVC) (SCH 80) (4") (BORE) | 3,201 LF | $35 | $112k | 3% |
| 505-7001 TMA (STATIONARY) | 304 DAY | $330 | $100k | 3% |
| 688-7001 PED DETECT PUSH BUTTON (APS) | 110 EA | $850 | $94k | 3% |
| 687-7001 PED POLE ASSEMBLY | 67 EA | $1,250 | $84k | 2% |
| 531-7005 CURB RAMPS (TY 1) | 19 EA | $4,250 | $81k | 2% |