US 90 (FM 2830-FM 770 North) Overlay
Liberty County · est $2.1M
Liberty County · est $2.1M
3 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | TEXAS MATERIALS GROUP, INC. | $1,939,953.24 | — |
| 2 | DURWOOD GREENE CONSTRUCTION CO. | $1,969,127.25 | $29,174.01 |
| 3 | HAYDEN PAVING, INC. | $1,990,203.60 | $50,250.36 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7030 SP MIXES SP-C SAC-A PG76-22 | 4,451 TON | $150.25 | $669k | 34% |
| 341-7043 D-GR HMA TY-D PG64-22 | 3,338 TON | $130 | $434k | 22% |
| 361-7046 FULL-DEPTH REPAIR CPJR (VAR DEPTH) | 180 CY | $1,481 | $267k | 14% |
| 500-7001 MOBILIZATION | 1 LS | $147,000 | $147k | 8% |
| 351-7009 FLEXIBLE PAVEMENT STRUCTURE REPAIR(10") | 600 SY | $91 | $55k | 3% |
| 354-7095 PLANE ASPH PAV (0" TO 3.5") | 5,289 SY | $9.75 | $52k | 3% |
| 100-7002 PREPARING ROW | 19 STA | $2,614 | $50k | 3% |
| 505-7001 TMA (STATIONARY) | 120 DAY | $330 | $40k | 2% |
| 644-7001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 62 EA | $621.5 | $39k | 2% |
| 530-7022 INTRSCT, DRVWAYS, & TURNOUT (ACP) | 1,200 SY | $20.25 | $24k | 1% |