FY 25 Burnet Co. Guardrail
Burnet County · est $3.8M
Burnet County · est $3.8M
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | BK FIELD OPERATIONS LLC | $1,043,063.00 | — |
| 2 | ROSS SA ENTERPRISE LLC | $1,256,081.00 | $213,018.00 |
| 3 | B & MS CONSTRUCTION, INC. | $3,004,670.00 | $1,961,607.00 |
| 4 | ABOVE ALL CONTRACTING LLC | $3,563,750.00 | $2,520,687.00 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 770-7013 REM OBSOLETE GET & REPL W/ SGT | 170 EA | $3,000 | $510k | 49% |
| 770-7001 REPLACE RAIL ELEMENT (W-BEAM) | 20,500 LF | $6 | $123k | 12% |
| 770-7018 REPLACE BLOCKOUT | 1,200 EA | $100 | $120k | 12% |
| 770-7006 REPLACE TIMBER POST W/O CONC FND | 750 EA | $120 | $90k | 9% |
| 770-7008 REPLACE TIMBER POST W/ CONC FND | 750 EA | $80 | $60k | 6% |
| 770-7010 REALIGN POSTS | 300 EA | $125 | $38k | 4% |
| 451-7020 RETROFIT RAIL (TY T631) | 200 LF | $80 | $16k | 2% |
| 774-7060 REPLACE (BEAT - SSCC) | 3 EA | $4,000 | $12k | 1% |
| 770-7002 REPLACE RAIL ELEMENT (THRIE-BEAM) | 500 LF | $20 | $10k | 1% |
| 770-7015 REPL SINGLE GDRAIL TERM IMPACT HEAD | 5 EA | $2,000 | $10k | 1% |