SH 171; Fr W Owen St to S of BB Fielder
Parker County · est $2.3M
Parker County · est $2.3M
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | O. TREVINO CONSTRUCTION, LLC | $1,234,417.37 | — |
| 2 | EMERY SAPP & SON'S INC. | $1,392,431.80 | $158,014.43 |
| 3 | SELECT MAINTENANCE, L.L.C. | $1,604,553.71 | $370,136.34 |
| 4 | DIAMOND SURFACE, INC. | $2,323,830.30 | $1,089,412.93 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 3017-7001 CONTINUOUS GRINDING-CONCRETE PAVEMENT | 77,648 SY | $5.75 | $446k | 36% |
| 361-7004 FULL - DEPTH REPAIR CRCP (9") | 125 CY | $989 | $124k | 10% |
| 361-7006 FULL - DEPTH REPAIR CRCP (11") | 125 CY | $972 | $122k | 10% |
| 500-7001 MOBILIZATION | 1 LS | $120,000 | $120k | 10% |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 31,378 LF | $2.45 | $77k | 6% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $24,525 | $74k | 6% |
| 505-7003 TMA (MOBILE OPERATION) | 44 DAY | $780 | $34k | 3% |
| 666-7244 RE PM TY III (W)(24")(SLD) | 4,560 LF | $7.5 | $34k | 3% |
| 720-7001 SPALLING REPAIR (HYDRAULIC CEMENT) | 100 CF | $305 | $31k | 2% |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 4 EA |
| $5,000 |
| $20k |
| 2% |