TPWD Various; PK Fish Hatchery
Palo Pinto County · est $690k
Palo Pinto County · est $690k
7 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | JAGOE-PUBLIC COMPANY | $324,932.30 | — |
| 2 | TEXAS MATERIALS GROUP, INC. | $373,520.32 | $48,588.02 |
| 3 | PEACHTREE CONSTRUCTION, LTD. | $460,868.70 | $135,936.40 |
| 4 | NORTHEASTERN PAVERS, LLC | $470,898.53 | $145,966.23 |
| 5 | PROFESSIONAL TRAFFIC CONTROL LLC | $477,180.30 | $152,248.00 |
| 6 | PRATER DIRT WORK LLC | $616,893.00 | $291,960.70 |
| 7 | A. L. HELMCAMP, INC. | $730,489.60 | $405,557.30 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7025 SP MIXES SP-C SAC-B PG70-28 | 679 TON | $145 | $98k | 30% |
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 1,012 SY | $60 | $61k | 19% |
| 500-7001 MOBILIZATION | 1 LS | $36,000 | $36k | 11% |
| 506-7044 BIODEG EROSN CONT LOGS (INSTL) (12") | 7,994 LF | $3.75 | $30k | 9% |
| 354-7002 PLANE & TEXT ASPH CONC PAV(0" TO 2") | 5,883 SY | $4 | $24k | 7% |
| 510-7002 ONE-WAY TRAF CONT (PILOT CAR) | 72 HR | $240 | $17k | 5% |
| 134-7001 BACKFILL (TY A) | 50 STA | $300 | $15k | 5% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 1 MO | $12,000 | $12k | 4% |
| 510-7001 ONE-WAY TRAF CONT (FLAGGER CONT) | 144 HR | $60 | $9k | 3% |
| 506-7046 BIODEG EROSN CONT LOGS (REMOVE) | 7,994 LF | $0.7 |
| $6k |
| 2% |