SH 121 Intersection Improvements 2
Fannin County · est $1.8M
Fannin County · est $1.8M
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | HIGHWAY 19 CONSTRUCTION LLC | $1,979,904.95 | — |
| 2 | JAGOE-PUBLIC COMPANY | $2,267,540.70 | $287,635.75 |
| 3 | TEXAS MATERIALS GROUP, INC. | $2,300,326.86 | $320,421.91 |
| 4 | A. K. GILLIS & SONS, LLC | $2,856,829.78 | $876,924.83 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 341-7001 D-GR HMA TY-B PG64-22 | 1,736 TON | $162 | $281k | 14% |
| 500-7001 MOBILIZATION | 1 LS | $180,000 | $180k | 9% |
| 344-7009 SP MIXES SP-C PG64-22 | 630 TON | $250 | $158k | 8% |
| 247-7046 FL BS (CMP IN PLC)(TY A GR 4) (6") | 3,952 SY | $35 | $138k | 7% |
| 545-7018 CCA (INSTL)(N)(TL3)(WORK ZONE) | 3 EA | $35,000 | $105k | 5% |
| 423-7015 RETAINING WALL (SPREAD FOOTING) | 270 SF | $350 | $95k | 5% |
| 6017-7001 VDS PROSR SYS | 6 EA | $11,000 | $66k | 3% |
| 686-7054 INS TRF SIG PL AM(S)1 ARM(50')ILSN | 2 EA | $26,700 | $53k | 3% |
| 100-7002 PREPARING ROW | 21 STA | $2,500 | $53k | 3% |
| 132-7009 EMBANK (FNL)(OC)(TY C2) | 2,544 CY | $18 | $46k | 2% |