US 75 at White St
Collin County · est $400k
Collin County · est $400k
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | RHINO EQUITY, LLC | $336,918.67 | — |
| 2 | SCOUT 5 CONSTRUCTION LLC | $363,501.24 | $26,582.57 |
| 3 | CENTRAL NORTH CONSTRUCTION, LLC | $389,999.00 | $53,080.33 |
| 4 | ABESCAPE LANDSCAPING, LLC | $419,005.75 | $82,087.08 |
| 5 | TIGHT LINE CONSTRUCTION, LLC | $435,315.00 | $98,396.33 |
| 6 | RARE EARTH LANDSCAPE SOLUTIONS LLC | $478,502.33 | $141,583.66 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 170-7001 IRRIGATION SYSTEM | 1 LS | $60,000 | $60k | 18% |
| 194-7013 RDSIDE AMENITY (TYPE 2) | 34 EA | $1,500 | $51k | 15% |
| 500-7001 MOBILIZATION | 1 LS | $40,000 | $40k | 12% |
| 192-7023 LOOSE AGGR GRND COVER | 546 CY | $60 | $33k | 10% |
| 505-7001 TMA (STATIONARY) | 60 DAY | $500 | $30k | 9% |
| 192-7026 PLANT MATERIAL (1 GAL) | 3,195 EA | $8 | $26k | 8% |
| 192-7029 PLANT MATERIAL (5 GAL) | 773 EA | $29.99 | $23k | 7% |
| 192-7001 MULCH | 305 CY | $60 | $18k | 5% |
| 194-7012 RDSIDE AMENITY (TYPE 1) | 9 EA | $1,500 | $14k | 4% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $2,500 | $10k | 3% |