0069-02-035 US 87 SB @ Cannibal Draw
Glasscock County · est $3.0M
Glasscock County · est $3.0M
8 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | RAGLE CONSTRUCTION, INC. | $2,242,482.25 | — |
| 2 | STRUCTURAL INTEGRITY GROUP LLC | $2,253,653.40 | $11,171.15 |
| 3 | THE TRUESDELL CORPORATION | $2,377,377.00 | $134,894.75 |
| 4 | GIBSON & ASSOCIATES, INC. | $2,608,442.37 | $365,960.12 |
| 5 | PATHFIELD INVESTMENTS LLC | $3,030,697.25 | $788,215.00 |
| 6 | ICOS MANAGEMENT, LLC | $3,479,991.50 | $1,237,509.25 |
| 7 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | $3,817,185.00 | $1,574,702.75 |
| 8 | SOUTHERN ROAD & BRIDGE, LLC | $4,703,404.00 | $2,460,921.75 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 439-7017 POLYESTER POLYMER CONC OVERLAY (2") | 1,454 SY | $250 | $364k | 16% |
| 4010-7004 STEEL BRIDGE ZONE PAINTING REF STR #3 | 1 EA | $250,000 | $250k | 11% |
| 500-7001 MOBILIZATION | 1 LS | $220,000 | $220k | 10% |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 2,225 SF | $95 | $211k | 9% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 14 MO | $15,000 | $210k | 9% |
| 451-7049 RETROFIT RAIL (TY T131RC) | 840 LF | $175 | $147k | 7% |
| 4010-7001 STEEL BRIDGE ZONE PAINTING REF STR #1 | 1 EA | $100,000 | $100k | 4% |
| 4010-7003 STEEL BRIDGE ZONE PAINTING REF STR #2 | 1 EA | $100,000 | $100k | 4% |
| 439-7014 MULTI-LAYER POLYMER OVERLAY | 2,172 SY | $40 | $87k | 4% |
| 512-7077 PTB (FUR&INST)(F SHAPE)(TY 1) OR (STL) |
| 450 LF |
| $100 |
| $45k |
| 2% |