2023 Hsip Curve (FM 563) Chevrons, RS
Chambers County · est $2.5M
Chambers County · est $2.5M
3 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | HAYDEN PAVING, INC. | $2,499,686.76 | — |
| 2 | DURWOOD GREENE CONSTRUCTION CO. | $2,515,777.00 | $16,090.24 |
| 3 | TEXAS MATERIALS GROUP, INC. | $2,903,388.40 | $403,701.64 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Bid tab · TxDOT
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7030 SP MIXES SP-C SAC-A PG76-22 | 5,975 TON | $158 | $944k | 38% |
| 341-7064 D-GR HMA TY-D PG 64-22 (EXEMPT) | 4,482 TON | $137 | $614k | 25% |
| 6068-7003 LED CHEVRON | 76 EA | $2,650 | $201k | 8% |
| 500-7001 MOBILIZATION | 1 LS | $133,775 | $134k | 5% |
| 530-7025 DRIVEWAYS AND TURNOUTS (ACP) | 4,789 SY | $16.86 | $81k | 3% |
| 685-7001 INSTALL RDSD FLASH BEACON ASSEMBLY | 13 EA | $5,500 | $72k | 3% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $15,000 | $60k | 2% |
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 464 SY | $125 | $58k | 2% |
| 134-7004 BACKFILL (TY A OR B) | 24 STA | $2,300 | $55k | 2% |
| 530-7015 DRIVEWAYS (BASE) | 1,385 SY | $23 | $32k | 1% |