FY 2025 BTAO BR FUA Repairs
Travis County · est $1.6M
Travis County · est $1.6M
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | STRUCTURAL INTEGRITY GROUP LLC | $865,709.00 | — |
| 2 | TAYLOR CONTRACTING LLC | $1,024,847.00 | $159,138.00 |
| 3 | SCR CIVIL CONSTRUCTION, LLC | $1,233,300.50 | $367,591.50 |
| 4 | BLACKSMITH VENTURES LLC | $1,332,425.00 | $466,716.00 |
| 5 | PREMIER CONTRACTORS LLC | $1,502,302.00 | $636,593.00 |
| 6 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | $1,864,550.00 | $998,841.00 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 534 SF | $430 | $230k | 27% |
| 446-7005 CLEAN & PAINT EXIST RAIL (SYSTEM II) | 1 LS | $156,000 | $156k | 18% |
| 787-7001 REPLACING ELASTOMERIC BEARING PADS | 20 EA | $3,180 | $64k | 7% |
| 500-7001 MOBILIZATION | 1 LS | $61,000 | $61k | 7% |
| 432-7045 RIPRAP (STONE PROTECTION)(24 IN) | 199 CY | $250 | $50k | 6% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 12 MO | $3,785 | $45k | 5% |
| 446-7021 CLEAN AND PAINT EXIST STR (REF NO. 2) | 8 EA | $5,645 | $45k | 5% |
| 495-7001 RAISING EXIST STRUCT | 3 LS | $15,000 | $45k | 5% |
| 784-7008 REP STL BRIDGE MEMBER (BEARINGS) | 20 EA | $2,000 | $40k | 5% |
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 110 CY |
| $255 |
| $28k |
| 3% |