BAAO/STAO - BR FUA Repairs (FY25)
Travis County · est $3.3M
Travis County · est $3.3M
8 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | ICOS MANAGEMENT, LLC | $2,334,542.00 | — |
| 2 | SCR CIVIL CONSTRUCTION, LLC | $2,461,841.00 | $127,299.00 |
| 3 | PREMIER CONTRACTORS LLC | $2,499,331.00 | $164,789.00 |
| 4 | STRUCTURAL INTEGRITY GROUP LLC | $2,594,477.75 | $259,935.75 |
| 5 | PATHFIELD INVESTMENTS LLC | $2,736,830.00 | $402,288.00 |
| 6 | ROY JORGENSEN ASSOCIATES, INC. | $3,446,875.00 | $1,112,333.00 |
| 7 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | $3,579,680.00 | $1,245,138.00 |
| 8 | GREY SKY CONSTRUCTION LLC | $4,316,235.00 | $1,981,693.00 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 2,521 SF | $200 | $504k | 22% |
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 1,410 CY | $200 | $282k | 12% |
| 500-7001 MOBILIZATION | 1 LS | $265,000 | $265k | 11% |
| 432-7045 RIPRAP (STONE PROTECTION)(24 IN) | 1,077 CY | $200 | $215k | 9% |
| 429-7001 CONC STR REPAIR(CLEAN & COAT WTH EPOXY) | 1,000 SF | $132 | $132k | 6% |
| 495-7002 RAISING EXIST STRUCT | 2 EA | $44,000 | $88k | 4% |
| 785-7010 BRIDGE JOINT REPLACEMENT (ARMOR) | 140 LF | $550 | $77k | 3% |
| 420-7061 CL C CONC (COLLAR) | 14 EA | $4,400 | $62k | 3% |
| 786-7001 CARBON FIBER REINF POLYMER PROTECTION | 286 SF | $200 | $57k | 2% |
| 429-7005 CONC STR REPAIR(DECK REP (FULL DEPTH)) | 100 SF |
| $550 |
| $55k |
| 2% |