FM 3438 Shared Use Path Carbon Reduction
Taylor County · est $319k
Taylor County · est $319k
7 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | 3LW CIVIL LLC | $254,408.38 | — |
| 2 | ICOS MANAGEMENT, LLC | $291,371.00 | $36,962.62 |
| 3 | STX CIVIL | $301,356.45 | $46,948.07 |
| 4 | TI-ZACK CONCRETE, LLC | $315,071.05 | $60,662.67 |
| 5 | GARRET SHIELDS INFRASTRUCTURE | $367,523.00 | $113,114.62 |
| 6 | BONTKE BROTHERS CONSTRUCTION COMPANY | $373,248.00 | $118,839.62 |
| 7 | TIGHT LINE CONSTRUCTION, LLC | $380,920.00 | $126,511.62 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 531-7001 CONC SIDEWALKS (4") | 1,687 SY | $71.35 | $120k | 47% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $16,717 | $50k | 20% |
| 500-7001 MOBILIZATION | 1 LS | $25,642 | $26k | 10% |
| 530-7006 DRIVEWAYS (CONC) | 188 SY | $130 | $24k | 10% |
| 104-7011 REMOV CONC (DRIVEWAYS) | 188 SY | $30 | $6k | 2% |
| 104-7013 REMOV CONC (SIDEWALK, RAMP OR SUP) | 197 SY | $28.5 | $6k | 2% |
| 666-7411 REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 305 LF | $12.65 | $4k | 2% |
| 644-7065 RELOCATE SM RD SN SUP&AM TY 10BWG | 6 EA | $550 | $3k | 1% |
| 132-7002 EMBANK (FNL)(DC)(TY A) | 26 CY | $100 | $3k | 1% |
| 531-7005 CURB RAMPS (TY 1) | 1 EA | $2,500 | $3k | 1% |