FY 25, Mailbox Installation & Maint
Harris County · est $236k
Harris County · est $236k
2 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | ROY JORGENSEN ASSOCIATES, INC. | $221,860.00 | — |
| 2 | ABOVE ALL CONTRACTING LLC | $246,020.00 | $24,160.00 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 560-7008 MAILBOX INSTALL-S (TWW-POST) TY 4 | 247 EA | $730 | $180k | 81% |
| 500-7002 MOBILIZATION (CALLOUT) | 20 EA | $1,250 | $25k | 11% |
| 560-7010 MAILBOX INSTALL-M (TWW-POST) TY 4 | 9 EA | $850 | $8k |
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
| 3% |
| 560-7009 MAILBOX INSTALL-D (TWW-POST) TY 4 | 6 EA | $750 | $5k | 2% |
| 560-7012 RELOCATE EXISTING MAILBOX | 10 EA | $400 | $4k | 2% |
| 505-7001 TMA (STATIONARY) | 300 DAY | $1 | $300 | 0% |
| 505-7003 TMA (MOBILE OPERATION) | 100 DAY | $1 | $100 | 0% |