6476-84-001 Conc. Struc. Repair
Live Oak County · est $537k
Live Oak County · est $537k
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | RHINO EQUITY, LLC | $456,790.00 | — |
| 2 | TAYLOR CONTRACTING LLC | $729,208.00 | $272,418.00 |
| 3 | LUCANIA CONTRACTORS LLC | $768,700.00 | $311,910.00 |
| 4 | CRACKSEAL OF TEXAS, LLC | $855,040.00 | $398,250.00 |
| 5 | RESTEK, INC. | $1,046,340.00 | $589,550.00 |
| 6 | SALINAS CONSTRUCTION TECHNOLOGIES, LTD. | $1,139,804.52 | $683,014.52 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 358 CY | $250 | $90k | 20% |
| 432-7045 RIPRAP (STONE PROTECTION)(24 IN) | 280 CY | $250 | $70k | 15% |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 136 DAY | $300 | $41k | 9% |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 302 SF | $130 | $39k | 9% |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 395 LF | $90 | $36k | 8% |
| 500-7001 MOBILIZATION | 1 LS | $30,000 | $30k | 7% |
| 420-7059 CL C CONC(PILE ENCASEMENT) | 20 LF | $1,000 | $20k | 4% |
| 446-7019 SPOT CLEAN & PNT EXT STR(SPL PROT SYS) | 2 LS | $10,000 | $20k | 4% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $5,000 | $20k | 4% |
| 787-7001 REPLACING ELASTOMERIC BEARING PADS |
| 4 EA |
| $5,000 |
| $20k |
| 4% |