SL 12 at Forsythe Drive to Mystic Trail
Dallas County · est $5.1M
Dallas County · est $5.1M
2 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | GARRET SHIELDS INFRASTRUCTURE | $4,443,436.65 | — |
| 2 | GREY SKY CONSTRUCTION LLC | $6,021,719.00 | $1,578,282.35 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Bid tab · TxDOT
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $460,000 | $460k | 10% |
| 680-7005 INS HY TRF SIG (DPT SUP CNT & CAB)(ISO) | 7 EA | $50,000 | $350k | 8% |
| 344-7002 SP MIXES SP-B SAC-B PG64-22 | 1,825 TON | $180 | $329k | 7% |
| 432-7001 RIPRAP (CONC)(4 IN) | 205 CY | $1,000 | $205k | 5% |
| 416-7046 DRILL SHAFT (TRF SIG POLE) (48 IN) | 154 LF | $950 | $146k | 3% |
| 260-7006 LIME TRT (EXIST MATL)(6") | 2,873 SY | $50 | $144k | 3% |
| 618-7065 CONDT (PVC) (SCH 80) (4") (BORE) | 2,336 LF | $60 | $140k | 3% |
| 618-7061 CONDT (PVC) (SCH 80) (3") (BORE) | 2,381 LF | $52 | $124k | 3% |
| 105-7008 RMV (8"-12") TRT/UNTRT BASE & ASPH PAV | 2,938 SY | $40 | $118k | 3% |
| 344-7021 SP MIXES SP-C SAC-B PG70-22 | 447 TON | $250 | $112k | 3% |