SL 12 From N of Maddox rd to Hillburn Dr
Dallas County · est $2.5M
Dallas County · est $2.5M
5 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | YUNEX LLC | $2,415,555.00 | — |
| 2 | GREY SKY CONSTRUCTION LLC | $2,507,895.00 | $92,340.00 |
| 3 | WG ENGINEERING & CONSTRUCTION, LLC | $2,509,805.50 | $94,250.50 |
| 4 | ED BELL CONSTRUCTION COMPANY | $2,619,701.08 | $204,146.08 |
| 5 | DURABLE SPECIALTIES, INC. | $2,638,456.00 | $222,901.00 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 9 MO | $29,500 | $266k | 11% |
| 500-7001 MOBILIZATION | 1 LS | $214,728 | $215k | 9% |
| 680-7005 INS HY TRF SIG (DPT SUP CNT & CAB)(ISO) | 4 EA | $37,905 | $152k | 6% |
| 505-7001 TMA (STATIONARY) | 199 DAY | $555 | $110k | 5% |
| 624-7008 GROUND BOX TY D (162922)W/APRON | 25 EA | $3,850 | $96k | 4% |
| 416-7046 DRILL SHAFT (TRF SIG POLE) (48 IN) | 110 LF | $850 | $94k | 4% |
| 416-7044 DRILL SHAFT (TRF SIG POLE) (36 IN) | 117 LF | $750 | $88k | 4% |
| 686-7059 INS TRF SIG PL AM(S)1 ARM(55')LUM | 2 EA | $40,500 | $81k | 3% |
| 686-7051 INS TRF SIG PL AM(S)1 ARM(48')LUM | 4 EA | $18,875 | $76k | 3% |
| 529-7002 CONC CURB (TY II) | 763 LF | $94 |
| $72k |
| 3% |