SH 44 Safety Illumination
Duval County · est $971k
Duval County · est $971k
7 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | STRUCTURAL INTEGRITY GROUP LLC | $779,407.58 | — |
| 2 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., LLC | $808,365.30 | $28,957.72 |
| 3 | MALDONADO-BURKETT, LLP | $828,773.35 | $49,365.77 |
| 4 | THE LEVY COMPANY, LLC | $846,502.85 | $67,095.27 |
| 5 | JASCO | $858,260.05 | $78,852.47 |
| 6 | VACA UNDERGROUND UTILITIES INC | $872,464.90 | $93,057.32 |
| 7 | TRIPLE H FIELD SERVICES, LLC | $926,192.55 | $146,784.97 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 610-7126 IN RD IL (TY SA) 40T-10 (250W EQ) LED | 58 EA | $3,880 | $225k | 29% |
| 618-7030 CONDT (PVC) (SCH 40) (2") | 11,522 LF | $11.41 | $131k | 17% |
| 416-7040 DRILL SHAFT (RDWY ILL POLE) (30 IN) | 580 LF | $177 | $103k | 13% |
| 500-7001 MOBILIZATION | 1 LS | $70,550 | $71k | 9% |
| 505-7001 TMA (STATIONARY) | 210 DAY | $220 | $46k | 6% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 MO | $6,000 | $42k | 5% |
| 432-7005 RIPRAP (CONC)(CL B) | 20.3 CY | $1,753 | $36k | 5% |
| 628-7009 ELC SRV TY A 120/240 060(NS)SS(E)SP(O) | 4 EA | $6,840 | $27k | 4% |
| 618-7055 CONDT (PVC) (SCH 80) (2") (BORE) | 692 LF | $34.09 | $24k | 3% |
| 620-7006 ELEC CONDR (NO.10) INSULATED | 11,716 LF | $1.26 |
| $15k |
| 2% |