SH 16; 1.5 MI S of FM 2353
Palo Pinto County · est $4.1M
Palo Pinto County · est $4.1M
5 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | GARRET SHIELDS INFRASTRUCTURE | $4,272,843.10 | — |
| 2 | RAGLE CONSTRUCTION, INC. | $4,539,237.50 | $266,394.40 |
| 3 | SOUTHERN ROAD & BRIDGE, LLC | $5,759,345.00 | $1,486,501.90 |
| 4 | GIBSON & ASSOCIATES, INC. | $6,213,078.75 | $1,940,235.65 |
| 5 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | $7,211,509.20 | $2,938,666.10 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 446-7021 CLEAN AND PAINT EXIST STR (REF NO. 2) | 1 EA | $900,000 | $900k | 21% |
| 446-7020 CLEAN AND PAINT EXIST STR (REF NO. 1) | 1 EA | $800,000 | $800k | 19% |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 2,101 SF | $200 | $420k | 10% |
| 500-7001 MOBILIZATION | 1 LS | $300,000 | $300k | 7% |
| 438-7007 CLEANING AND SEALING EXIST JOINTS (CL7) | 3,929 LF | $50 | $196k | 5% |
| 785-7009 BRIDGE JOINT REPLACEMENT (CONCRETE) | 392 LF | $400 | $157k | 4% |
| 439-7014 MULTI-LAYER POLYMER OVERLAY | 1,739 SY | $75 | $130k | 3% |
| 429-7001 CONC STR REPAIR(CLEAN & COAT WTH EPOXY) | 453 SF | $250 | $113k | 3% |
| 2005-7001 TIED-CONCRETE BLOCK EROSION CONTROL MAT | 2,550 SF | $40 | $102k | 2% |
| 505-7001 TMA (STATIONARY) |
| 297 DAY |
| $300 |
| $89k |
| 2% |