FY2026 FM 466 at Cordell Creek
Guadalupe County · est $64k
Guadalupe County · est $64k
8 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | TEXAS ROAD CONSTRUCTION, LLC | $58,581.10 | — |
| 2 | BK FIELD OPERATIONS LLC | $60,020.10 | $1,439.00 |
| 3 | GARRET SHIELDS INFRASTRUCTURE | $78,467.00 | $19,885.90 |
| 4 | BECK-REIT & SONS, LTD. | $78,586.00 | $20,004.90 |
| 5 | RELMCO, INC. | $82,895.00 | $24,313.90 |
| 6 | ROY JORGENSEN ASSOCIATES, INC. | $99,779.00 | $41,197.90 |
| 7 | AAD CONTRACTING INC. | $107,942.00 | $49,360.90 |
| 8 | CASTILLO ARANDA LLC | $125,665.00 | $67,083.90 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 459-7007 GABION MATTRESSES (GALV)(12 IN) | 195 SY | $115 | $22k | 38% |
| 432-7002 RIPRAP (CONC)(5 IN) | 12 CY | $850 | $10k | 17% |
| 500-7001 MOBILIZATION | 1 LS | $10,000 | $10k | 17% |
| 432-7029 RIPRAP (STONE COMMON)(DRY)(6 IN) | 20 CY | $400 | $8k | 14% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 1 MO | $1,500 | $2k | 3% |
| 110-7002 EXCAV (CHANNEL) | 10 CY | $125 | $1k | 2% |
| 752-7005 TREE REMOVAL (4" - 12" DIA) | 4 EA | $300 | $1k | 2% |
| 104-7046 REMOV CONC (MISC) | 10 SY | $100 | $1k | 2% |
| 169-7001 SOIL RET BLKT(SL_MOD_CLAY_SHORT) | 250 SY | $3 | $750 | 1% |
| 506-7020 CONSTRUCTION EXITS (INSTALL) (TY 1) | 112 SY | $6 | $672 | 1% |