CR 1590; at Big Sandy Creek
Wise County · est $854k
Wise County · est $854k
8 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | HODGES AND SON CONSTRUCTION COMPANY, INC. | $961,912.00 | — |
| 2 | GARRET SHIELDS INFRASTRUCTURE | $967,630.80 | $5,718.80 |
| 3 | TEXAS STEEL INDUSTRIAL PLACING, LLC | $999,854.08 | $37,942.08 |
| 4 | SCOTT TUCKER CONSTRUCTION COMPANY, LLC | $1,013,240.85 | $51,328.85 |
| 5 | COPPELL CONSTRUCTION CO., INC. | $1,140,750.70 | $178,838.70 |
| 6 | ED BELL CONSTRUCTION COMPANY | $1,265,000.00 | $303,088.00 |
| 7 | EARTH BUILDERS, L.P. | $1,372,183.75 | $410,271.75 |
| 8 | THK CONSTRUCTION LLC | $1,590,868.31 | $628,956.31 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 508-7001 CONSTRUCTING DETOURS | 1,094 SY | $100 | $109k | 11% |
| 416-7006 DRILL SHAFT (36 IN) | 300 LF | $310 | $93k | 10% |
| 500-7001 MOBILIZATION | 1 LS | $85,000 | $85k | 9% |
| 420-7013 CL C CONC (ABUT)(HPC) | 31 CY | $1,900 | $59k | 6% |
| 422-7002 REINF CONC SLAB (HPC) | 1,820 SF | $32 | $58k | 6% |
| 432-7045 RIPRAP (STONE PROTECTION)(24 IN) | 320 CY | $180 | $58k | 6% |
| 132-7004 EMBANK (FNL)(DC)(TY B) | 1,560 CY | $30 | $47k | 5% |
| 247-7067 FL BS (CMP IN PLC)(TY A GR 1-2) (8") | 900 SY | $48 | $43k | 4% |
| 344-7023 SP MIXES SP-C PG70-28 | 95.5 TON | $450 | $43k | 4% |
| 422-7014 APPROACH SLAB (HPC) | 38.5 CY | $1,000 | $39k | 4% |