2025 Hsip (SH 146) Signals & Beacons
Chambers County · est $409k
Chambers County · est $409k
8 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | DECO CONTRACTORS, INC. | $314,786.60 | — |
| 2 | TRAF-TEX, INC. | $339,970.40 | $25,183.80 |
| 3 | ALLSTATE SIGNAL & CONSTRUCTION, LLC | $376,614.54 | $61,827.94 |
| 4 | THIRD COAST SERVICES LLC | $388,929.24 | $74,142.64 |
| 5 | CREACOM, INC. | $408,989.20 | $94,202.60 |
| 6 | STRUCTURAL INTEGRITY GROUP LLC | $432,962.50 | $118,175.90 |
| 7 | FLORIDA TRAFFIC CONTROL DEVICES, INC. | $456,888.00 | $142,101.40 |
| 8 | SELECT MAINTENANCE, L.L.C. | $536,643.85 | $221,857.25 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 686-7064 INS TRF SIG PL AM(S)1 ARM(60')LUM&ILSN | 2 EA | $30,000 | $60k | 19% |
| 680-7003 INSTALL HWY TRF SIG (SYSTEM) | 1 EA | $32,500 | $33k | 10% |
| 500-7001 MOBILIZATION | 1 LS | $31,000 | $31k | 10% |
| 416-7008 DRILL SHAFT (48 IN) | 66 LF | $450 | $30k | 9% |
| 686-7060 INS TRF SIG PL AM(S)1 ARM(55')LUM&ILSN | 1 EA | $29,000 | $29k | 9% |
| 6017-7018 VID IMAGE AND RADAR DET PROCESSOR SYS | 1 EA | $25,000 | $25k | 8% |
| 6007-7001 BBU SYSTEM (EXTERNAL BATTERY CABINET) | 1 EA | $8,100 | $8k | 3% |
| 684-7012 TRF SIG CBL (TY A)(12 AWG)(7 CONDR) | 1,570 LF | $4.9 | $8k | 2% |
| 621-7006 TRAY CABLE (4 CONDR) (12 AWG) | 2,050 LF | $3.7 | $8k | 2% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING |
| 5 MO |
| $1,500 |
| $8k |
| 2% |