FY 26 Districtwide Bridge Maintenance
Travis County · est $1.3M
Travis County · est $1.3M
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | TAYLOR BRIDGE LLC | $732,645.75 | — |
| 2 | BK FIELD OPERATIONS LLC | $743,185.00 | $10,539.25 |
| 3 | BECK-REIT & SONS, LTD. | $819,725.00 | $87,079.25 |
| 4 | GARRET SHIELDS INFRASTRUCTURE | $846,929.00 | $114,283.25 |
| 5 | PREMIER CONTRACTORS LLC | $889,017.50 | $156,371.75 |
| 6 | GREY SKY CONSTRUCTION LLC | $1,221,130.00 | $488,484.25 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 432-7035 RIPRAP (STONE COMMON)(DRY)(36 IN) | 698 CY | $360 | $251k | 34% |
| 432-7034 RIPRAP (STONE COMMON)(DRY)(24 IN) | 155 CY | $325 | $50k | 7% |
| 500-7001 MOBILIZATION | 1 LS | $50,000 | $50k | 7% |
| 459-7010 GABIONS (3' X 3')(GALV) | 109 CY | $400 | $44k | 6% |
| 403-7002 TEMPORARY SPL SHORING (COFFERDAM) | 1,740 SF | $25 | $44k | 6% |
| 459-7012 GABIONS (5'X 3')(GALV) | 107 CY | $400 | $43k | 6% |
| 432-7002 RIPRAP (CONC)(5 IN) | 6 CY | $5,000 | $30k | 4% |
| 466-7162 WINGWALL (FW - S) (HW=6 FT) | 2 EA | $15,000 | $30k | 4% |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 54 SF | $550 | $30k | 4% |
| 401-7001 FLOWABLE BACKFILL | 67 CY | $350 | $23k | 3% |