SH130 & SH45 Frontage Road Mill & Inlay
Travis County · est $18M
Travis County · est $18M
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | LONE STAR PAVING COMPANY | $12,111,218.45 | — |
| 2 | ALLEN KELLER COMPANY | $12,180,421.46 | $69,203.01 |
| 3 | HUNTER INDUSTRIES, LTD. | $12,507,940.74 | $396,722.29 |
| 4 | TEXAS MATERIALS GROUP, INC. | $16,540,270.65 | $4,429,052.20 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 347-7001 TOM-C PG76-22 SAC-A | 29,782 TON | $151 | $4.50M | 37% |
| 341-7059 D-GR HMA TY-D PG76-22 (LEVEL-UP) | 28,099 TON | $126 | $3.54M | 29% |
| 354-7019 PLANE & TEXT ASPH CONC PAV(2") | 470,251 SY | $1.9 | $893k | 7% |
| 351-7023 FLEXIBLE PAVEMENT STRUCTURE REPAIR(24") | 7,549 SY | $115 | $868k | 7% |
| 351-7005 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") | 10,678 SY | $53 | $566k | 5% |
| 500-7001 MOBILIZATION | 1 LS | $357,000 | $357k | 3% |
| 3007-7001 BONDING COURSE | 116,155 GAL | $2.9 | $337k | 3% |
| 512-7009 PORT CTB (FUR & INST)(LOW PROF)(TY 1) | 4,000 LF | $35 | $140k | 1% |
| 438-7007 CLEANING AND SEALING EXIST JOINTS (CL7) | 1,465 LF | $78 | $114k | 1% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING |
| 20 MO |
| $4,500 |
| $90k |
| 1% |