Specialty Pavement Markings FY 26
De Witt County · est $186k
De Witt County · est $186k
7 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | HIGHWAY BARRICADES AND SERVICES, LLC | $112,281.05 | — |
| 2 | TRP INFRASTRUCTURE SERVICES, LLC | $113,869.00 | $1,587.95 |
| 3 | STRIPE LINES, INC. | $135,639.70 | $23,358.65 |
| 4 | PAVEMENT MARKINGS INC. | $149,461.60 | $37,180.55 |
| 5 | D. I. J. CONSTRUCTION, INC. | $161,582.00 | $49,300.95 |
| 6 | RHINO EQUITY, LLC | $188,241.00 | $75,959.95 |
| 7 | INTERSTATE BARRICADES & MARKINGS, INC. | $224,213.00 | $111,931.95 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 668-7089 PREFAB PM TY C (W)(24")(SLD) | 3,887 LF | $13.15 | $51k | 46% |
| 668-7087 PREFAB PM TY C (W)(12")(SLD) | 1,700 LF | $8.5 | $14k | 13% |
| 668-7103 PREFAB PM TY C (W)(WORD) | 50 EA | $250 | $13k | 11% |
| 668-7091 PREFAB PM TY C (W)(ARROW) | 69 EA | $150 | $10k | 9% |
| 668-7127 PREFAB PM TY C (Y)(24")(SLD) | 380 LF | $14 | $5k | 5% |
| 668-7088 PREFAB PM TY C (W)(18")(SLD) | 436 LF | $12 | $5k | 5% |
| 500-7001 MOBILIZATION | 1 LS | $5,000 | $5k | 4% |
| 668-7111 PREFAB PM TY C (W)(36")(YLD TRI) | 125 EA | $25 | $3k | 3% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 MO | $500 | $3k | 3% |
| 668-7108 PREFAB PM TY C (W)(RR XING) | 2 EA | $550 | $1k | 1% |