Backwall and Bridge Repair
Harris County · est $410k
Harris County · est $410k
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | STRUCTURAL INTEGRITY GROUP LLC | $280,600.00 | — |
| 2 | PREMIER CONTRACTORS LLC | $280,889.00 | $289.00 |
| 3 | ICOS MANAGEMENT, LLC | $352,908.00 | $72,308.00 |
| 4 | MC2 CIVIL, LLC | $393,710.00 | $113,110.00 |
| 5 | PATHFIELD INVESTMENTS LLC | $443,560.00 | $162,960.00 |
| 6 | ISI CONTRACTING, INC. | $496,152.00 | $215,552.00 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 1 MO | $65,000 | $65k | 23% |
| 785-7011 BRIDGE JOINT REPLACEMENT (SEJ) | 90 LF | $650 | $59k | 21% |
| 788-7001 CONCRETE BEAM REPAIR | 13 EA | $3,500 | $46k | 16% |
| 500-7001 MOBILIZATION | 1 LS | $26,000 | $26k | 9% |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 86 DAY | $270 | $23k | 8% |
| 780-7002 CNC CRACK REPAIR (DISCRETE)(INJECT) | 416 LF | $45 | $19k | 7% |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 318 LF | $45 | $14k | 5% |
| 776-7002 REPAIR (STEEL POST W/BASE PLATE) | 2 EA | $5,000 | $10k | 4% |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 30 SF | $225 | $7k | 2% |
| 505-7001 TMA (STATIONARY) | 22 DAY | $300 | $7k |
| 2% |