Asphaltic Concrete Pavement Repairs
Lavaca County · est $982k
Lavaca County · est $982k
3 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | HUNTER INDUSTRIES, LTD. | $791,562.44 | — |
| 2 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | $889,836.15 | $98,273.71 |
| 3 | BLACKSMITH VENTURES LLC | $1,139,311.00 | $347,748.56 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Bid tab · TxDOT
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 341-7050 D-GR HMA TY-D SAC-B PG70-22 | 4,839 TON | $99 | $479k | 61% |
| 354-7066 PLANE CONC PAV(0" TO 2") | 43,979 SY | $1.43 | $63k | 8% |
| 500-7001 MOBILIZATION | 1 LS | $62,238 | $62k | 8% |
| 316-7066 ASPH (AC-15P OR AC-10-2TR OR CRS-2P) | 14,954 GAL | $3.96 | $59k | 7% |
| 316-7232 AGGR (TY-PE, GR-4)(SAC-B) | 339 CY | $109.34 | $37k | 5% |
| 666-7293 TY I HIGH PERF PM (W)6"(SLD)(100MIL) | 18,572 LF | $1.35 | $25k | 3% |
| 666-7305 TY I HIGH PERF PM (Y)6"(SLD)(100MIL) | 17,004 LF | $1.35 | $23k | 3% |
| 668-7089 PREFAB PM TY C (W)(24")(SLD) | 621 LF | $15.25 | $9k | 1% |
| 351-7005 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") | 100 SY | $52.36 | $5k | 1% |
| 662-7114 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 3,086 EA | $1.63 | $5k | 1% |