BPM - FY 2026
Tom Green County · est $750k
Tom Green County · est $750k
11 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | BK FIELD OPERATIONS LLC | $505,933.90 | — |
| 2 | BECK-REIT & SONS, LTD. | $521,754.90 | $15,821.00 |
| 3 | BLACKSMITH VENTURES LLC | $568,190.40 | $62,256.50 |
| 4 | ROY JORGENSEN ASSOCIATES, INC. | $576,643.00 | $70,709.10 |
| 5 | SCOUT 5 CONSTRUCTION LLC | $583,191.66 | $77,257.76 |
| 6 | PREMIER CONTRACTORS LLC | $689,534.00 | $183,600.10 |
| 7 | MPB, INC. | $732,531.00 | $226,597.10 |
| 8 | SCR CIVIL CONSTRUCTION, LLC | $752,677.70 | $246,743.80 |
| 9 | SCOTT TUCKER CONSTRUCTION COMPANY, LLC | $781,118.30 | $275,184.40 |
| 10 | PATHFIELD INVESTMENTS LLC | $872,597.50 | $366,663.60 |
| 11 | 3LW CIVIL LLC | $938,810.72 | $432,876.82 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 2,345 SF | $90 | $211k | 42% |
| 499-7001 ADJUST STL SHOES | 9 EA | $7,000 | $63k | 12% |
| 4010-7001 STEEL BRIDGE ZONE PAINTING REF STR #1 | 1 EA | $59,000 | $59k | 12% |
| 438-7007 CLEANING AND SEALING EXIST JOINTS (CL7) | 859 LF | $45 | $39k | 8% |
| 401-7001 FLOWABLE BACKFILL | 54 CY | $400 | $22k | 4% |
| 500-7001 MOBILIZATION | 1 LS | $20,000 | $20k | 4% |
| 505-7001 TMA (STATIONARY) | 10 DAY | $2,000 | $20k | 4% |
| 432-7041 RIPRAP (STONE PROTECTION)(12 IN) | 81.7 CY | $240 | $20k | 4% |
| 110-7002 EXCAV (CHANNEL) | 220 CY | $80 | $18k | 3% |
| 466-7162 WINGWALL (FW - S) (HW=6 FT) | 1 EA | $8,000 | $8k | 2% |