BPM Joint Replacement 07 10.25
Collin County · est $33k
Collin County · est $33k
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | PREMIER CONTRACTORS LLC | $40,833.00 | — |
| 2 | 12TWELVE ROAD AND BRIDGE LLC | $60,793.30 | $19,960.30 |
| 3 | HIGHWAY 19 CONSTRUCTION LLC | $73,150.00 | $32,317.00 |
| 4 | GARRET SHIELDS INFRASTRUCTURE | $83,980.00 | $43,147.00 |
| 5 | STRUCTURAL INTEGRITY GROUP LLC | $86,110.00 | $45,277.00 |
| 6 | AAD CONTRACTING INC. | $133,980.00 | $93,147.00 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
Addenda are temporarily unavailable. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 785-7008 BRIDGE JOINT REPAIR (PARTIAL DEPTH) | 336 LF | $100 | $34k | 82% |
| 438-7007 CLEANING AND SEALING EXIST JOINTS (CL7) | 42 LF | $100 | $4k | 10% |
| 500-7001 MOBILIZATION | 1 LS | $3,000 | $3k | 7% |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 16 DAY | $1 | $16 | 0% |
| 505-7001 TMA (STATIONARY) | 16 DAY | $1 | $16 | 0% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 1 MO | $1 | $1 | 0% |