GTAO/NAAO Bridge FUA Repairs
Travis County · est $1.0M
Travis County · est $1.0M
13 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | BK FIELD OPERATIONS LLC | $769,928.00 | — |
| 2 | TAYLOR BRIDGE LLC | $820,942.00 | $51,014.00 |
| 3 | GARRET SHIELDS INFRASTRUCTURE | $872,420.00 | $102,492.00 |
| 4 | ICOS MANAGEMENT, LLC | $1,002,849.00 | $232,921.00 |
| 5 | STRUCTURAL INTEGRITY GROUP LLC | $1,073,202.00 | $303,274.00 |
| 6 | RESTEK, INC. | $1,111,782.63 | $341,854.63 |
| 7 | SCR CIVIL CONSTRUCTION, LLC | $1,113,411.00 | $343,483.00 |
| 8 | BECK-REIT & SONS, LTD. | $1,116,790.00 | $346,862.00 |
| 9 | BLACKSMITH VENTURES LLC | $1,184,230.00 | $414,302.00 |
| 10 | ROAD DOCTORS LLC | $1,184,404.00 | $414,476.00 |
| 11 | PREMIER CONTRACTORS LLC | $1,238,968.00 | $469,040.00 |
| 12 | MPB, INC. | $1,243,584.00 | $473,656.00 |
| 13 | MYERS CONCRETE CONSTRUCTION, LP | $1,422,863.00 | $652,935.00 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 460-7014 CMP (GAL STL 72 IN) | 260 LF | $600 | $156k | 20% |
| 446-7020 CLEAN AND PAINT EXIST STR (REF NO. 1) | 1 EA | $111,000 | $111k | 14% |
| 500-7001 MOBILIZATION | 1 LS | $80,000 | $80k | 10% |
| 432-7045 RIPRAP (STONE PROTECTION)(24 IN) | 356 CY | $185 | $66k | 9% |
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 265 CY | $185 | $49k | 6% |
| 451-7052 RETROFIT RAIL (ADD HSS) | 348 LF | $130 | $45k | 6% |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 494 LF | $80 | $40k | 5% |
| 785-7004 BRIDGE JOINT REPAIR (ARMOR) | 79 LF | $475 | $38k | 5% |
| 785-7002 BRIDGE JOINT REPAIR (HEADER) | 116 LF | $300 | $35k | 5% |
| 459-7009 GABION MATTRESSES (GALV) (24 IN) | 90 SY | $300 | $27k |
| 4% |