Flexible Pavement Repair Denton CO FY 26
Denton County · est $687k
Denton County · est $687k
7 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | FOUTSCO PAVING COMPANY, LLC | $662,133.21 | — |
| 2 | OVERLAND CORPORATION | $683,203.38 | $21,070.17 |
| 3 | TEXAS MATERIALS GROUP, INC. | $693,843.95 | $31,710.74 |
| 4 | EUROVIA ATLANTIC COAST LLC | $697,939.25 | $35,806.04 |
| 5 | JAGOE-PUBLIC COMPANY | $759,373.20 | $97,239.99 |
| 6 | PEACHTREE CONSTRUCTION, LTD. | $773,553.65 | $111,420.44 |
| 7 | ICOS MANAGEMENT, LLC | $837,902.86 | $175,769.65 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7011 SP MIXES SP-C SAC-B PG64-22 | 2,343 TON | $166 | $389k | 59% |
| 351-7009 FLEXIBLE PAVEMENT STRUCTURE REPAIR(10") | 2,130 SY | $100 | $213k | 32% |
| 354-7002 PLANE & TEXT ASPH CONC PAV(0" TO 2") | 21,297 SY | $1.5 | $32k | 5% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 2 MO | $5,000 | $10k | 2% |
| 666-7411 REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 10,125 LF | $0.55 | $6k | 1% |
| 666-7423 REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 5,960 LF | $0.55 | $3k | 0% |
| 666-7066 REFL PAV MRK TY I (W)(WORD)(100MIL) | 12 EA | $188 | $2k | 0% |
| 666-7042 REFL PAV MRK TY I (W)(ARROW)(100MIL) | 13 EA | $162 | $2k | 0% |
| 666-7036 REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 193 LF | $7.15 | $1k | 0% |
| 500-7001 MOBILIZATION |
| 1 LS |
| $1,000 |
| $1k |
| 0% |