Full Depth Concrete Repair Kaufman FY'26
Kaufman County · est $2.1M
Kaufman County · est $2.1M
8 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | ROY JORGENSEN ASSOCIATES, INC. | $1,708,740.00 | — |
| 2 | O. TREVINO CONSTRUCTION, LLC | $1,738,075.00 | $29,335.00 |
| 3 | GHB EQUIPMENT COMPANY, L.L.C. | $1,977,364.00 | $268,624.00 |
| 4 | 3LW CIVIL LLC | $1,980,645.00 | $271,905.00 |
| 5 | CROSS PLUS CONSTRUCTION, LLC | $1,989,308.00 | $280,568.00 |
| 6 | STRUCTURAL INTEGRITY GROUP LLC | $2,059,850.00 | $351,110.00 |
| 7 | GARRET SHIELDS INFRASTRUCTURE | $2,343,260.00 | $634,520.00 |
| 8 | SILVER CREEK CONSTRUCTION, INC. | $2,446,985.00 | $738,245.00 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 361-7045 FULL-DEPTH REPAIR CPCD (VAR DEPTH) | 1,280 CY | $935 | $1.20M | 70% |
| 361-7044 FULL-DEPTH REPAIR CRCP (VAR DEPTH) | 205 CY | $950 | $195k | 11% |
| 720-7003 SPALLING REPAIR (POLYMERIC) (SEMIRIGID) | 1,350 GAL | $65 | $88k | 5% |
| 505-7001 TMA (STATIONARY) | 146 DAY | $500 | $73k | 4% |
| 429-7004 CONC STR REPAIR(RAPID DECK REP(PRT DPT) | 500 SF | $120 | $60k | 4% |
| 500-7002 MOBILIZATION (CALLOUT) | 8 EA | $5,000 | $40k | 2% |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 146 DAY | $140 | $20k | 1% |
| 361-7009 FULL - DEPTH REPAIR CRCP (14") | 20 CY | $900 | $18k | 1% |
| 361-7025 FULL - DEPTH REPAIR CPCD (14") | 20 CY | $900 | $18k | 1% |