Culvert Cleaning - Districtwide
Mclennan County · est $968k
Mclennan County · est $968k
3 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | SKYLINE CONSTRUCTION PAVING & STRIPING | $881,110.43 | — |
| 2 | GARRET SHIELDS INFRASTRUCTURE | $888,672.50 | $7,562.07 |
| 3 | AAD CONTRACTING INC. | $1,027,079.00 | $145,968.57 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 760-7001 DITCH CLEANING AND RESHAPING (FOOT) | 44,625 LF | $4.59 | $205k | 23% |
| 735-7060 DRIFTWOOD REMOVAL | 2,215 CY | $89.1 | $197k | 22% |
| 467-7001 SET (PIPE RUNNER ASSEMBLY) | 75 EA | $2,503 | $188k | 21% |
| 764-7020 STORM SEWER CLEAN (BOX CULV) (>96 SF) | 1,330 LF | $63.16 | $84k | 10% |
| 764-7019 STORM SEWER CLEAN (BOX CULV)(48-<96 SF) | 3,170 LF | $18.28 | $58k | 7% |
| 752-7003 TREE TRIMMING / BRUSH REMOVAL(CHANNELS) | 46.2 AC | $1,117 | $52k | 6% |
| 764-7018 STORM SEWER CLEAN (BOX CULV)(24-<48 SF) | 2,351 LF | $17.81 | $42k | 5% |
| 467-7003 SET (REPLACE PIPE RUNNER ASSEMBLY) | 68 EA | $342.32 | $23k | 3% |
| 505-7001 TMA (STATIONARY) | 51 DAY | $197.41 | $10k | 1% |
| 764-7017 STORM SEWER CLEAN (BOX CULV)(12-<24 SF) |
| 720 LF |
| $11.13 |
| $8k |
| 1% |