Repair/Replace Concrete Barrier 09 1125
Ellis County · est $552k
Ellis County · est $552k
7 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | BK FIELD OPERATIONS LLC | $408,528.00 | — |
| 2 | GARRET SHIELDS INFRASTRUCTURE | $493,350.00 | $84,822.00 |
| 3 | IBCTX, LLC | $562,300.00 | $153,772.00 |
| 4 | CROSS PLUS CONSTRUCTION, LLC | $671,414.00 | $262,886.00 |
| 5 | GIBSON & ASSOCIATES, INC. | $690,000.00 | $281,472.00 |
| 6 | STRUCTURAL INTEGRITY GROUP LLC | $725,464.00 | $316,936.00 |
| 7 | O. TREVINO CONSTRUCTION, LLC | $953,050.00 | $544,522.00 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 1,500 SF | $120 | $180k | 44% |
| 778-7001 CONCRETE RAIL REPAIR (IN-KIND) | 200 LF | $600 | $120k | 29% |
| 514-7001 PERM CTB (SGL SLOPE) (TY 1) (42 ) | 300 LF | $150 | $45k | 11% |
| 512-7108 PORT CTB (ALIGNING) | 1,200 LF | $20 | $24k | 6% |
| 514-7013 PERM CTB (F-SHAPE) (TY 1) | 150 LF | $125 | $19k | 5% |
| 514-7014 PERM CTB (F-SHAPE) (TY 2) | 120 LF | $125 | $15k | 4% |
| 500-7033 MOBILIZATION (EMERGENCY) | 6 EA | $500 | $3k | 1% |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 42 DAY | $60 | $3k | 1% |
| 505-7001 TMA (STATIONARY) | 250 DAY | $1 | $250 | 0% |
| 500-7002 MOBILIZATION (CALLOUT) | 8 EA | $1 | $8 | 0% |