2026-01 San Augustine MBGF
San Augustine County · est $181k
San Augustine County · est $181k
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | ACE CONTRACTORS, INC. | $120,970.05 | — |
| 2 | RHINO EQUITY, LLC | $142,570.00 | $21,599.95 |
| 3 | AAD CONTRACTING INC. | $173,235.00 | $52,264.95 |
| 4 | PREMIER CONTRACTORS LLC | $326,550.00 | $205,579.95 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 770-7013 REM OBSOLETE GET & REPL W/ SGT | 10 EA | $5,000 | $50k | 41% |
| 770-7001 REPLACE RAIL ELEMENT (W-BEAM) | 750 LF | $37.5 | $28k | 23% |
| 505-7001 TMA (STATIONARY) | 30 DAY | $400 | $12k | 10% |
| 500-7002 MOBILIZATION (CALLOUT) | 10 EA | $1,000 | $10k | 8% |
| 774-7032 REPAIR (WIDE QUAD) | 5 LF | $2,000 | $10k | 8% |
| 770-7020 RESET SGT IMPACT HEAD | 5 EA | $500 | $3k | 2% |
| 770-7006 REPLACE TIMBER POST W/O CONC FND | 25 EA | $75 | $2k | 2% |
| 770-7016 REPLACE SINGLE GDRAIL TERMINAL RAIL | 25 LF | $50 | $1k | 1% |
| 770-7017 REPLACE SINGLE GDRAIL TERMINAL POST | 10 EA | $125 | $1k | 1% |
| 770-7010 REALIGN POSTS | 30 EA | $40 | $1k | 1% |