2025-10 Trinity MBGF
Trinity County · est $147k
Trinity County · est $147k
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | ABOVE ALL CONTRACTING LLC | $169,015.00 | — |
| 2 | AAD CONTRACTING INC. | $190,624.00 | $21,609.00 |
| 3 | ACE CONTRACTORS, INC. | $208,241.00 | $39,226.00 |
| 4 | RHINO EQUITY, LLC | $314,750.00 | $145,735.00 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 770-7013 REM OBSOLETE GET & REPL W/ SGT | 25 EA | $4,000 | $100k | 59% |
| 540-7001 MTL W-BEAM GD FEN (TIM POST) | 750 LF | $35 | $26k | 16% |
| 505-7001 TMA (STATIONARY) | 30 DAY | $500 | $15k | 9% |
| 776-7008 REPAIR (T101RC) | 75 LF | $50 | $4k | 2% |
| 542-7001 REMOVE METAL BEAM GUARD FENCE | 700 LF | $5 | $4k | 2% |
| 540-7005 MTL BEAM GD FEN TRANS (THRIE-BEAM) | 2 EA | $1,700 | $3k | 2% |
| 770-7006 REPLACE TIMBER POST W/O CONC FND | 50 EA | $50 | $3k | 1% |
| 770-7018 REPLACE BLOCKOUT | 50 EA | $50 | $3k | 1% |
| 778-7001 CONCRETE RAIL REPAIR (IN-KIND) | 50 LF | $50 | $3k | 1% |
| 540-7007 MTL BEAM GD FEN TRANS (T101) | 2 EA | $1,000 | $2k | 1% |