Baao FY26 GR- SL109; SH21; US290; FM1704
Bastrop County · est $356k
Bastrop County · est $356k
8 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | APEX LANDSCAPE & IRRIGATION, LLC | $224,026.70 | — |
| 2 | TIGHT LINE CONSTRUCTION, LLC | $288,954.00 | $64,927.30 |
| 3 | RARE EARTH LANDSCAPE SOLUTIONS LLC | $300,791.11 | $76,764.41 |
| 4 | GREEN SAGE SERVICES LLC | $309,324.10 | $85,297.40 |
| 5 | TEXAS ROAD CONSTRUCTION, LLC | $336,390.00 | $112,363.30 |
| 6 | SHALOM SERVICES CORPORATION | $608,789.50 | $384,762.80 |
| 7 | CENTRAL NORTH CONSTRUCTION, LLC | $645,244.00 | $421,217.30 |
| 8 | RATLIFF HARDSCAPE, LTD. | $707,068.30 | $483,041.60 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 192-7026 PLANT MATERIAL (1 GAL) | 7,255 EA | $9 | $65k | 29% |
| 180-7001 WILDFLOWER SEEDING | 18.89 AC | $1,760 | $33k | 15% |
| 193-7001 LANDSCAPE ESTABLISH | 24 MO | $1,000 | $24k | 11% |
| 193-7007 IRRIG SYS OPER AND MAINT | 24 MO | $1,000 | $24k | 11% |
| 500-7001 MOBILIZATION | 1 LS | $22,555 | $23k | 10% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $3,000 | $12k | 5% |
| 170-7009 IRRIGATION SYSTEM (LOC B) | 1 EA | $10,600 | $11k | 5% |
| 160-7006 FURN & PLACE TOPSOIL (12") | 781 SY | $8.5 | $7k | 3% |
| 170-7008 IRRIGATION SYSTEM (LOC A) | 1 EA | $6,400 | $6k | 3% |
| 105-7014 RMV (14"-18") TRT/UNTRT BASE & ASPH PAV | 336 SY | $16 | $5k | 2% |