Hill AO - Base Repair
Hill County · est $821k
Hill County · est $821k
3 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | BIG CREEK CONSTRUCTION, LTD. | $734,700.00 | — |
| 2 | TEXAS MATERIALS GROUP, INC. | $839,775.00 | $105,075.00 |
| 3 | KNIFE RIVER CORPORATION - SOUTH | $963,526.50 | $228,826.50 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 341-7048 D-GR HMA TY-D PG70-22 | 1,500 TON | $125 | $188k | 26% |
| 341-7022 D-GR HMA TY-C PG70-22 | 1,050 TON | $130 | $137k | 19% |
| 351-7003 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") | 3,000 SY | $35 | $105k | 14% |
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 1,500 SY | $70 | $105k | 14% |
| 354-7051 PLANE ASPH CONC PAV(2") | 24,000 SY | $3.25 | $78k | 11% |
| 505-7001 TMA (STATIONARY) | 75 DAY | $400 | $30k | 4% |
| 3006-7001 UNDERSEAL COURSE | 5,100 GAL | $5 | $26k | 3% |
| 341-7082 TACK COAT | 3,000 GAL | $5 | $15k | 2% |
| 505-7002 TMA (MOBILE OPERATION) | 60 HR | $175 | $11k | 1% |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 60 DAY | $150 | $9k | 1% |